TDOT reports road work in Putnam and Cumberland counties

TDOT says construction and utility work will continue on roads in Putnam and Cumberland counties during the Nov. 5–11 reporting period.

By Cookeville Local Staff
Ask AI

Summarize this page with

ChatGPTClaudePerplexityGoogle AI
Editorial illustration: TDOT reports road work in Putnam and Cumberland counties

In short

  • The Tennessee Department of Transportation says lane closures and construction work are scheduled on several Upper Cumberland roads during its Nov....
  • In Putnam County, construction continues in the median of Interstate 40 between mile markers 303.6 and 304.2, with traffic shifted along the projec...
  • The department says a contractor will also perform punch-list work on State Route 136, where temporary lane closures and flaggers are possible.

The Tennessee Department of Transportation says lane closures and construction work are scheduled on several Upper Cumberland roads during its Nov. 5–11 reporting period, including routes in Putnam and Cumberland counties.

In Putnam County, construction continues in the median of Interstate 40 between mile markers 303.6 and 304.2, with traffic shifted along the project route, according to TDOT. The department says a contractor will also perform punch-list work on State Route 136, where temporary lane closures and flaggers are possible.

TDOT says utility work on State Route 291 between State Routes 24 and 56 and on State Route 56 between Hulon Ferrell Road and Old Gainesboro Road is scheduled from 9 a.m. to 2 p.m. through Dec. 18. Utility work on State Route 84, from the White County line to Hidden Acres Road, is scheduled from 8 a.m. to 3 p.m. through Jan. 2, 2027, the department says.

In Cumberland County, TDOT says a long-term closure is in place on State Route 24 between the Crossville city limits and Seventh-Day Adventist Church and School, with a detour using State Routes 462 and 1. The department says work continues on State Route 1 between Deep Water Road and near POW Camp Road, with temporary lane closures and flagging expected Monday through Friday.

TDOT also reports ongoing work on Interstate 40 near mile markers 304.4–306.6 and 328.2–328.4. At the latter site, near Crab Orchard, one lane of Main Street is closed during bridge repairs and a temporary signal directs traffic, according to the department. The announcement lists no project costs or public contact for these work items.

Know someone who should see this?

Ask AI

Summarize this page with

ChatGPTClaudePerplexityGoogle AI

Also in Cookeville

Your town, every weekday morning

What’s on today, new local guides and stories, in one short free email.

Free. Unsubscribe any time.