TDOT lists road work and possible closures across the Upper Cumberland

TDOT’s Nov. 12–18 report lists construction, utility work and possible lane closures across the Upper Cumberland.

By Cookeville Local Staff
Ask AI

Summarize this page with

ChatGPTClaudePerplexityGoogle AI
Editorial illustration: TDOT lists road work and possible closures across the Upper Cumberland

In short

  • The Tennessee Department of Transportation says construction and utility work may bring lane closures, flaggers and traffic changes across the Uppe...
  • In Putnam County, bridge repairs and resurfacing continue in the I-40 median between mile markers 303.6 and 304.2, and traffic has shifted along th...
  • On SR-136, north of the SR-111 interchange to south of the I-40 interchange, a contractor is scheduled to perform punch-list work; temporary lane c...

The Tennessee Department of Transportation says construction and utility work may bring lane closures, flaggers and traffic changes across the Upper Cumberland from Nov. 12 through 18, according to its roadway activity report.

In Putnam County, bridge repairs and resurfacing continue in the I-40 median between mile markers 303.6 and 304.2, and traffic has shifted along the project route, the department said. On SR-136, north of the SR-111 interchange to south of the I-40 interchange, a contractor is scheduled to perform punch-list work; temporary lane closures and flaggers are possible, according to the report.

Utility work on SR-291 (Bloomington Road) between SR-24 and SR-56 is scheduled from 9 a.m. to 2 p.m. through Dec. 18, with flagging-assisted lane closures, trucks, signs and traffic-control devices, the department said. Similar hours and closures are listed for SR-56 (Gainesboro Highway), between Hulon Ferrell Road and Old Gainesboro Road, through Dec. 18, according to the report. On SR-84 (Calfkiller Highway), from the White County line to Hidden Acres Road, flagger-assisted closures are scheduled from 8 a.m. to 3 p.m. through Jan. 2, 2027, the department said.

The report also lists contractor call-out work for thermoplastic pavement-marking retracing on SR-135 between Green Gate Lane and the I-40 eastbound ramps in Putnam County, with lane closures in both directions, according to TDOT.

In Cumberland and Fentress counties, traffic is shifted to a new alignment on US-127 (SR-28) from near North Lowe Road to north of SR-62; intermittent lane closures and flaggers are being used as needed, the department said. In Cumberland County, grading and paving continue on US-127 from north of I-40 to near Potato Farm Road, with temporary closures or traffic stoppages possible, according to the report.

The report lists paving and lane closures on SR-26 in DeKalb County, including one lane closed in each direction from near Old Snow Hill Road to west of Curtis Road, and possible closures near the SR-26/SR-53 intersection, TDOT said. The announcement did not provide project costs or a contact for these work notices.

Know someone who should see this?

Ask AI

Summarize this page with

ChatGPTClaudePerplexityGoogle AI

Also in Cookeville

Your town, every weekday morning

What’s on today, new local guides and stories, in one short free email.

Free. Unsubscribe any time.